Brief portrait
Development of a neighborhood solution for the former slaughterhouse site in Weimar.
Creation of a total of 478 apartments, a nursing home, a medical center, and a hotel, as well as a central heating plant with an attached local heating network for all new buildings.
Development of neighborhood solution:
- Energy concept
- Call for tenders for contractors for the heating plant and the low-temperature local heating network
Project management of building services (LP 1-8) Heating, ventilation, sanitation, electrical
- Modern low-temperature local heating network with decentralized drinking water heating
- Combination of gas condensing boilers and combined heat and power plant (CHP)
- Heating center:
- 1 CHP unit 50 kW elt / 100 kW th
- 1 CHP unit 100 kW elt / 170 kW th
- 2 gas condensing boilers, each 800 kW
- Apartment stations with underfloor heating and drinking water heating using the continuous flow principle
- Preparation for a PV system (cooperative model)
- Modern, intelligent measuring system (smart meter, submetering)
- Application for KfW 55 subsidy