Brief portrait
A modern new dental practice for children has been built in an existing office building in Jena. IPH was awarded the contract for planning the heating, ventilation, sanitary and electrical installations. The fact that the technology had to be connected to the existing installation posed a challenge. Drainage could only be achieved via a lifting system in the raised floor.
The interior rooms are ventilated via a flat unit with heat recovery. A particular focus was on supplying the treatment rooms with medical gases. IPH planned the medical oxygen and a nitrous oxide system.



