Ro70 Housing Project in WeimarConversion of a former hospital into Thuringia's largest intergenerational housing project

Planning/Construction Period2015 to 2020
ClientWohnprojekt Ro70 e.G.
Eduard-Rosenthal-Straße 70
99425 Weimar
Construction ProjectGross floor area: approx. 10,000 m²
Net usable floor area: approx. 8,500 m²
74 residential units, 11 commercial units, 
and 1 café, as well as the Lebenshilfe facility
Total construction costs20 million €
HVAC costs2.1 million €
ServicesService Phases 1–8 according to HOAI for the following trades:
Heating, ventilation, plumbing, electrical, and building automation
Energy concept—biomass generation, project management, building services engineering, photovoltaic system, assistance with applying for KfW 70 subsidies, economic feasibility analysis of heat generation according to VDI 2067

Brief portrait

A former hospital dating from the 1930s was converted into a multigenerational housing project.
A total of 74 residential units for approximately 200 residents were created, along with 11 commercial units and a café. One of the major tenants is Lebenshilfe. The goal was to implement a sustainable energy and heating concept for this barrier-free, multipurpose building.
Efficient Heating Concept:

  • 2 pellet boilers, each with a capacity of 200 kW: Sustainable heat supply 
    using renewable energy.
  • 12 m³ buffer storage tank: Ensures even
    heat output and demand-based energy distribution.
  • Low-temperature underfloor heating.

Individual heat and water distribution:

  • Decentralized apartment stations: Each apartment is supplied with
    heating as well as hot and cold
    drinking water via a flow-through system.
  • Central drinking water treatment: A fresh water station reliably and hygienically supplies
    Lebenshilfe in the main building.

Modern ventilation technology:

  • Decentralized individual room ventilators and
  • supply air recirculation via ALDs

Accessibility design:

  • Vertical lift for people with disabilities
  • Passenger elevator in the west wing

Conclusion:
The well-thought-out heating and utility concept combines sustainability, energy efficiency, and comfort. Modern technology, such as the pellet boiler system and decentralized utility systems, complemented by accessible design elements, make this building future-proof and inclusive for all user groups.

download as PDF print